Oct 6, 2025
Routine
16A - hot and cold water available; adequate pressure
Regulation: 511-6-1.06(1)(g),(h) - water supply, capacity; pressure (pf)
Upon arrival, Observed no hot water at multiple handsink in main kitchen. Advised PIC hot water generation and distribution systems shall be sufficient to meet the peak hot water demands throughout the food service establishment. COS: Hot water was restored from 73 to 102F and 74F to 103F.