Clarkston, DeKalb County

PEACHTREE CREEK AT PONCE

4692 E PONCE DE LEON AVE STONE MOUNTAIN, GA 30083

Pool
Latest score
100
Jun 18, 2025
City
Clarkston
County
DeKalb
Inspections
6

Score history

Inspection scores over time for this facility.

Inspection history

Georgia inspection history is score-based, with violations grouped under each recorded inspection.

Jun 18, 2025

Permit/Opening

Score: 1000 violations
No violations recorded for this inspection.

Jun 10, 2025

Permit/Opening

Score: 804 violations

4 - water clarity: main drains clearly visible

15 ptsCorrected: NoRepeat: No

13-189(c)(6):At all times when a pool is in use, the water shall be of such clarity that the main drains on the bottom of the pool at the deepest point are clearly visible from the deck. I observed the water cloudy and the main drains not clearly visible.

6 - proper disinfectant level

15 ptsCorrected: NoRepeat: No

13-189(c)(1):The free-chlorine residual in all parts of the pool shall be maintained at a concentration of no less than three parts per million (3ppm)at all times. I observed the chlorine below 3ppm.

7 - ph between 7.2 and 7.8

15 ptsCorrected: NoRepeat: No

13-189(c)(1):The pool shall be maintained in an alkaline condition at all times with a pH level between 7.2-7.8. I observed the pH above 7.8.

19 - adequate turnover rate

5 ptsCorrected: NoRepeat: No

13-190(a):The equipment shall be operated continuously on a twenty-four (24) hour basis to obtain the minimum required number of six (6) hours (pools). I observed the flow meter at 20 GPM. The flow meter was not operating correctly.

Jul 11, 2024

Re-inspection

Score: 951 violation

19 - adequate turnover rate

5 ptsCorrected: NoRepeat: No

13-190(b)(1) The equipment must be operated continuously too maintain a minimum of one turn over every 6 hours. It was observed that the flow meter was at 80 GPM , it needs to be at 148 GPM or higher for a 54,000 gallon pool.

Jun 24, 2024

Routine

Score: 851 violation

6 - proper disinfectant level

15 ptsCorrected: NoRepeat: No

13-189(c)(1) The free chlorine in all parts of the pool must be maintained at a minimum of 3.00 ppm and a maximum of 10.0 ppm. Free chlorine was measured at .10.

May 22, 2024

Permit/Opening

Score: 951 violation

19 - adequate turnover rate

5 ptsCorrected: NoRepeat: No

13-190(b)(1) The equipment must be operated continuously too maintain a minimum of one turn over every 6 hours. It was observed that the flow meter was at 80 GPM , it needs to be at 148 GPM or higher for a 54,000 gallon pool.

May 30, 2023

Re-inspection

Score: 951 violation

19 - adequate turnover rate

5 ptsCorrected: NoRepeat: No

13-190(b)(1) The equipment must be operated continuously too maintain a minimum of one turn over every 6 hours. It was observed that the flow meter was at 80 GPM , it needs to be at 148 GPM or higher for a 54,000 gallon pool.