May 1, 2026
Permit/Opening
2980 REDDING RD ATLANTA, GA 30319
Inspection scores over time for this facility.
Georgia inspection history is score-based, with violations grouped under each recorded inspection.
Permit/Opening
Permit/Opening
13-202(a)(2) Gate, near equipment room, not self closing.
13-189(c)(6) The water in tank is not clear. Need to be drained and refilled. Water is dark and murky.
13-189(c)(1) pH level should be between 7.2-7.8. pH was observed to be 7.0.
13-197(i) pH chemical feeder is not operational. Need to fix pH feeder. Need to replace feeder tube.
13-190(a)(7) Flowmeter not operational. Needs repair.
13-202(c) Chemical log books were not provided.
13-201(k) Women's bathroom needs soap.
13-201(j) Both bathrooms need trashcans with lids.
13-202(i) Emergency action plan not provided at the time of inspection.
13-198(a) Filters were not stored within equipment cabinets. pH acid jugs were stored outside of cabinet. Both should be stored within cabinet.
Routine
Re-inspection
13-202(g) Emergency phone was inoperable.
13-189(c)(1)-Chlorine shall be maintained at a range of 3ppm-10ppm
13-189(c)(1)-The pool shall be maintained in an alkaline condition at all times with a pH level between 7.2-7.8.
Flow Meter was inoperable. Unable to detect a reading.
13-190(b)(1): equipment shall be operated to obtain 1 turnover every 30 minutes. Flow meter not operational.
Did not have daily recordkeeping
Routine
13-202(a)(2) both gates were not self-closing or self-latching
Regulation: 511-3-5-.18(10)(c ) - (c) an operable, hard-wired, conventional telephone line or continuous powered source, weatherproof emergency phone shall be permanently installed in a conspicuous location within the pool enclosure and must be readily available to bathers at all tim
13-202(g) Emergency phone was inoperable.
13-189(c)(1)-Chlorine shall be maintained at a range of 3ppm-10ppm.
13-189(c)(1). The pool shall be maintained in an alkaline condition at all times with a pH level between 7.2-7.8
Permit/Opening
Re-inspection
13-189(c)(1): Chlorine shall be maintained at a range of 3ppm-10ppm. Obs: Chlorine observed at 0.14ppm. CPO adjusted to 7.19.
13-201(b): If no bathroom is required, a shower with hot water range of 70-104 degrees shall be provided for each 100 men or women. Obs: Deck shower has no hot water.
Routine
13-189(c)(1): Chlorine shall be maintained at a range of 3ppm-10ppm. Obs: Chlorine observed to measure at 0.18ppm.
13-190(b)(1): equipment shall be operated to obtain 1 turnover every 30 minutes. Obs: Flow meter not operational.
13-201(b): If no bathroom is required, a shower with hot water range of 70-104 degrees shall be provided for each 100 men or women. Obs: Deck shower has no hot water.
Permit/Opening
13-201(b) Deck shower not functional.