Bainbridge, Decatur County

Bainbridge YMCA Pool

1818 E SHOTWELL ST BAINBRIDGE, GA 39819

Pool
Latest score
100
Apr 28, 2026
City
Bainbridge
County
Decatur
Inspections
5

Score history

Inspection scores over time for this facility.

Inspection history

Georgia inspection history is score-based, with violations grouped under each recorded inspection.

Apr 28, 2026

Routine

Score: 1000 violations
No violations recorded for this inspection.

May 7, 2025

Routine

Score: 1000 violations
No violations recorded for this inspection.

Dec 18, 2024

Routine

Score: 1000 violations
No violations recorded for this inspection.

Apr 17, 2024

Routine

Score: 1000 violations
No violations recorded for this inspection.

Dec 18, 2023

Routine

Score: 942 violations

36 - daily recordkeeping: water testing and self inspection performed

Regulation: 511-3-5-.22(9) - (9) water testing frequency. the trained operator or responsible person shall collect water samples from the water in the pool for monitoring. an in-line sampling port may be used for water held in reservoirs. the water quality testing frequency shal

5 ptsCorrected: NoRepeat: No

Reviewed facility's water testing records. Observed total alkalinity testing has not been documented weekly on log sheet as required by rules. Observed a few days where chlorine was only tested one time daily. Chlorine and pH are required to be tested a minimum of two times during the hours of operation even if swimming pool is open half a day. Chlorine and pH are to be tested twice daily.

29 - toilets & lavatories: clean, maintained, and stocked

Regulation: 511-3-5-.19(2)(n) - (n) sanitary facility fixtures and dressing area fixtures and furniture shall be cleaned and sanitized with an epa-approved product and as needed to provide a clean and sanitary environment.

1 ptsCorrected: NoRepeat: No

Observed ceiling in men's locker room flaking and falling from ceiling throughout restroom/shower area of locker room. Facility is to research repair of ceiling in locker room and provide EH plan of corrective action within 60 days of how and when locker room ceiling repair will occur.