Jun 1, 2026
Permit/Opening
16 - pool deck: maintained, unobstructed and clean
Regulation: 511-3-5-.06(1)(l) - (l) open joints or gaps larger than three-sixteenths inch wide or with vertical elevations exceeding 1/4 inches shall be rectified using appropriate fillers. construction joints where pool coping meets the decks shall be watertight and shall not allo
Observed multiple missing tiles above pool shell. Pool tiles shall be maintained in good condition. Tiles shall be replaced prior to 2027 pool season.
37 - other violations of the chapter
observed pitting in pool shell in multiple areas. A plan of written documentation/ plan of correction shall be submitted health department prior to end of 2026 pool season. If not submitted pool will not be permitted in 2027 or until pool has been resurfaced.