Kingsland, Camden County

Ryans Cove

100 RYAN NICHOLAS DR KINGSLAND, GA 31548

Pool
Latest score
100
Apr 21, 2026
City
Kingsland
County
Camden
Inspections
5

Score history

Inspection scores over time for this facility.

Inspection history

Georgia inspection history is score-based, with violations grouped under each recorded inspection.

Apr 21, 2026

Permit/Opening

Score: 1000 violations
No violations recorded for this inspection.

Oct 7, 2025

Routine

Score: 942 violations

21 - cyanuric acid level not exceeding maximum

Regulation: 511-3-5-.17(4) - (4) stabilizer (if used) cyanuric acid,ppm ideal: 30-50 maximum: 90 comments: if stabilizer is: too high: - may reduce chlorine efficacy too low: - chlorine residual rapidly destroyed by sunlight note: stabilizer is not needed in indoor or br

4 ptsCorrected: NoRepeat: No

At time of inspection, the cyanuric acid level registered at 96 ppm (CYA must be below 90 ppm). CPO will drain some water and add some fresh water.

22 - signs: peak occupancy/pool/spa/signs legible and in clearview

Regulation: 511-3-5-.18(13)(c) - (c) a sign shall be posted stating the hours of operation in clear view near the entrance and shall state the theoretical peak occupancy.

2 ptsCorrected: NoRepeat: No

At time of inspection, the peak occupancy / hours of operation sign is missing. CPO will order the sign and install it ASAP.

Apr 15, 2025

Permit/Opening

Score: 982 violations

22 - signs: peak occupancy/pool/spa/signs legible and in clearview

Regulation: 511-3-5-.18(12)(b) - (b) where no lifeguard is on duty, a sign or signs shall be placed in clear view at or near the entrance to the pool and shall state in clearly legible letters at least four inches high “warning - no life guard on duty and risk of drowning - supervis

2 ptsCorrected: NoRepeat: No

At time of inspection, the "No lifeguard on duty..." sign is missing. CPO will order a sign and post it ASAP.

22 - signs: peak occupancy/pool/spa/signs legible and in clearview

Regulation: 511-3-5-.18(13)(c) - (c) a sign shall be posted stating the hours of operation in clear view near the entrance and shall state the theoretical peak occupancy.

2 ptsCorrected: NoRepeat: No

At time of inspection, the peak occupancy / hours of operation sign is missing. CPO will order a sign and post it ASAP.

Sep 19, 2024

Routine

Score: 1000 violations
No violations recorded for this inspection.

Apr 19, 2024

Permit/Opening

Score: 1000 violations
No violations recorded for this inspection.