Jun 11, 2026
Routine
12 - grab/hand rails, ladders installed and secure
Regulation: 511-3-5-.06(3)(f)1. - 1. handrails, if removable, shall be installed in such a way that they cannot be removed without the use of tools.
Observed loose rails around pool. C/A - tighten all loose handrails.
37 - other violations of the chapter
Observed Total Alkalinity at 40 ppm. C/A - adjust Total Alkalinity to at least 60 ppm. 511-3-5.22(12)