May 12, 2026
Permit/Opening
75 HELEN VALLEY DR BRASELTON, GA 30517
Inspection scores over time for this facility.
Georgia inspection history is score-based, with violations grouped under each recorded inspection.
Permit/Opening
Routine
Regulation: 511-3-5-.07(1)(a) - (a) the equipment for a swimming pool shall be of adequate size to turn over the entire pool water capacity. the turnover rate for pools constructed after the adoption of this chapter shall not exceed the sum of one and one-half times the average wat
Flow meter inoperable; cannot determine turnover
Regulation: 511-3-5-.07(4)(b) - (b) a flow meter measuring the rate of flow through the filter system with an appropriate range readable in gallons per minute (gpm) and accurate within ten percent actual flow shall be provided. the flow indicator shall be capable of measuring from
Flow meter inoperable
Permit/Opening
Permit/Opening
Routine
No daily record keeping documentation on site.
CPO inspection documentation not acessible on site.
Inspection report and permit not posted
Permit/Opening