Jul 22, 2025
Routine
16B - plumbing installed; proper backflow devices
Regulation: 511-6-1.06(2)(d) - backflow prevention, air gap (p)
Observed no air gap installed on prep sink. Must install within 10 days
16B - plumbing installed; proper backflow devices
Observed leaking pipe at prep sink water handle. Must repair within 10 days
13A - posted: permit/inspection/choking poster/handwashing
Regulation: 511-6-1.07(3)(d) - handwashing signage (c)
No handwashing sign provided at a handsink used by food employees. Provide hand washing signs inside employee restroom within 7 days.
14C - single-use/single-service articles: properly stored, used
Regulation: 511-6-1.05(10)(e)1&3 - single-service/single-use items stored 6" off floor in clean, dry location (c)
Observed boxes of single-service items stored on floor. Store 6 inches of floor. Manager moved boxes and placed on storage racks.
17A - toilet facilities: properly constructed, supplied, cleaned
Regulation: 511-6-1.07(2)(l) - toilet rooms, enclosed (c)
Bathroom not enclosed with tight-fitting, self-closing doors. (Employee restroom) Provide a self closing door within 7 days.
511-6-1.07(2)(l) - Toilet Rooms, Enclosed (C) (l) Toilet Rooms, Enclosed. Except where a toilet room is located outside a food service establishment and does not open directly into the food service establishment, such as a toilet room that is provided by the management of a shopping mall, a toilet room located on the premises shall be completely enclosed and provided with a tight-fitting and self-closing door.