May 12, 2026
Permit/Opening
1090 HAMPTON WAY NE ATLANTA, GA 30324
Inspection scores over time for this facility.
Georgia inspection history is score-based, with violations grouped under each recorded inspection.
Permit/Opening
Permit/Opening
Regulation: 511-3-5-.18(2) - (2) rope and float line. a rope and float line shall be provided within one foot of and on the shallow side of the break in grade between the shallow and deep portions of the swimming pool, with its position marked with visible floats at intervals of
Observed the pool go to 8 1/2 ft and no float line was in place and one of the holes was recently covered due to the pool being re plastered. CA- float line shall e in place at all times. 511-3-5-.18(2) - (2) Rope and Float Line. A rope and float line shall be provided within one foot of and on the shallow side of the break in grade between the shallow and deep portions of the swimming pool, with its position marked with visible floats at intervals of (2) Rope and Float Line.
Permit/Opening
Permit/Opening