Mar 20, 2026
Routine
101 S FRONT ST ALBANY, GA 31701
Inspection scores over time for this facility.
Georgia inspection history is score-based, with violations grouped under each recorded inspection.
Routine
Routine
Regulation: 511-6-2-.14(6) - bed, bedding, and linens
Observed stained mattress pad in room 323. CA: Beds, mattresses, springs, slats, mattress pads, mattress and bed coverings, pillow and pillow covers shall be clean and free from vermin. PIC replaced mattress pad
Regulation: 511-6-2-.14(1) - floors, walls, and ceilings
Observed ceiling above ice machine on 3rd floor in disrepair. CA: Floors, walls, ceilings. windows, doors and all other appurtenances shall be of sound construction, properly maintained in good repair and shall be kept clean. PIC will have the ceiling repaired
Routine
Regulation: 511-6-2-.14(5) - condition of furnishings
Observed refrigerator stand drawer not in good repair. CA: All furniture, draperies, appliances, carpets, and other accessories, in the tourist accommodation, whether the property of the tourist accommodation owner or not, shall be considered the property of and furnished by the tourist accommodation for purposes of enforcement of this Chapter, and must be maintained in good repair, clean, and free of vermin. PIC will have drawer repaired
Regulation: 511-6-2-.14(6) - bed, bedding, and linens
Observed stained mattress in room 317. CA: Beds, mattresses, springs, slats, mattress pads, mattress and bed coverings, pillow and pillow covers shall be clean and free from vermin. PIC will have mattress replaced
Regulation: 511-6-2-.14(1) - floors, walls, and ceilings
Observed ceiling above ice machine on 2nd and 3rd floor in disrepair. CA: Floors, walls, ceilings. windows, doors and all other appurtenances shall be of sound construction, properly maintained in good repair and shall be kept clean. PIC will have the ceiling repaired
Routine
Regulation: 511-6-2-.15(5) - heating and fire safety-inspection
Observed annual gas fire equipment inspection expired. CA: All gas-fired equipment shall be inspected at least annually by a qualified licensed contractor or local fire authority, if available. Points to be inspected are proper construction and installation, malfunctions and adjustments of controls and burners, faulty heat exchangers and vent obstructions. Any defects found on inspection must be corrected by a qualified heating contractor prior to use of the equipment. Upon request, the operator shall provide evidence of inspection and/or correction of any deficiency. PIC will contact certified plumber and send inspection report to EH office
Routine
Regulation: 511-6-2-.14(5) - condition of furnishings
Observed ripped carpet by the window in room 308 . PIC will have carpet repaired
Regulation: 511-6-2-.05(7) - inspection posting
Observed latest inspection report not displayed visible for public viewing. PIC will post new inspection report so that it is visible to the public