May 1, 2026
Permit/Opening
4900 CHEDWORTH DR STONE MOUNTAIN, GA 30087
Inspection scores over time for this facility.
Georgia inspection history is score-based, with violations grouped under each recorded inspection.
Permit/Opening
Permit/Opening
Re-inspection
Re-inspection
13-189(c)(1)- the free chlorine residual in all parts of the pool shall be maintained at a concentration of 3 to 10 ppm. Chlorine was recorded at 18.
Routine
13-202(g)-phone inoperable
13-189(c)(1)- the free chlorine residual in all parts of the pool shall be maintained at a concentration of 3 to 10 ppm
13-189(c)(1) Pool shall be maintained in an alkaline condition at all times with a pH level between 7.2-7.8
13-196(a)(4) Skimmer cover was missing because it was broken. They were waiting for a replacement.
Permit/Opening
Permit/Opening
Permit/Opening
13-189(c)(1)- the free chlorine residual in all parts of the pool shall be maintained at a concentration of no less than one and one half(1.5) parts per million or above 10 PPM
Pool observed at 51.74PPM
13-189(c)(1) Pool shall be maintained in an alkaline condition at all times with a pH level between 7.2-7.8
Ph at 8.6 upon arrival