May 20, 2026
Permit/Opening
19 - adequate turnover rate
13-190(a): The equipment shall be operated continuously on a twenty-four (24) hour basis to obtain minimum required of one turnover every six (6) hours (pools). Pool was observed at 120GPM and should be reaching 153GPM.
37 - other violations of the chapter
13-189(c)(1). Proper Test Kits available. An N-diethyl-p-phenylenediamine(D.P.D) TEST KIT or other approved method by the department to measure Free Chlorine residual shall be provided and used. At the time of inspection, teh test kit provided was observed with expired chemicals. Chemical expired between (6/25 to 9/25). Person in charged ordered a new kit during the inspection.