Jun 10, 2026
Routine
19 - adequate turnover rate
Regulation: 511-3-5-.07(1)(a) - (a) the equipment for a swimming pool shall be of adequate size to turn over the entire pool water capacity. the turnover rate for pools constructed after the adoption of this chapter shall not exceed the sum of one and one-half times the average wat
A reading of 133 gpm must be met to meet an adequate turnover rate. I observed a reading of 75 gpm.
36 - daily recordkeeping: water testing and self inspection performed
Regulation: 511-3-5-.22(12) - (12) a safety self-inspection shall be conducted daily by the trained operator or responsible person and documented on a log sheet.
Log should have 2 readings a day, I observed inconsistent readings in the logbook.
32 - operator training certification available onsite and approved
Regulation: 511-3-5-.22(2) - (2) the trained operator shall have a current certificate showing completion of an approved operator training course. a copy or the original certificate or documentation shall be available onsite for inspection by the health authority.
Inspection report wasn't posted, it was locked in the pumproom.
34 - inspection report placed in public view
Regulation: 511-3-5-.23(3)(d) - (d) the operator shall receive a copy of the inspection and place it in a location protected from the weather and in public view as designated by the health authority.
Pool Operator's certificate wasn't posted and displayed, it was locked in the pumproom.