Jun 4, 2026
Routine
601 26TH AVE SE MOULTRIE, GA 31768
Inspection scores over time for this facility.
Georgia inspection history is score-based, with violations grouped under each recorded inspection.
Routine
Routine
Routine
Regulation: 511-3-5-.23(5)(b) - (b) during operation, the ph is less than the minimum or more than the maximum levels allowed in dph rule 511-3-5-.l7.
Observed the pH level at 7.0. pH called maintenance to treat the pH level.
Routine
Regulation: 511-3-5-.07(4)(b) - (b) a flow meter measuring the rate of flow through the filter system with an appropriate range readable in gallons per minute (gpm) and accurate within ten percent actual flow shall be provided. the flow indicator shall be capable of measuring from
Observed flow meter not reading. PIC will have flow meter fixed/replaced to where it is properly working.
Routine
Regulation: 511-3-5-.23(5)(a) - (a) during operation, disinfectant levels are less than the minimum level specified in dph rule 511-3-5-.17. if the level of the disinfectant used is not specified in dph rule 511-3-5-.17, the disinfectant must be approved and kept at levels determin
Observed pool's free chlorine level at 0.6ppm. CA: All public pools free chlorine levels listed below: Minimum 1.0 Ideal 1.0-3.0 Maximum 10.0. PIC will bring free chlorine back into normal range.
Regulation: 511-3-5-.23(5)(b) - (b) during operation, the ph is less than the minimum or more than the maximum levels allowed in dph rule 511-3-5-.l7.
Observed the pH level at 7.0. pH range needs to be 7.2-7.8. CPO will bring pH into range of 7.2-7.8.
Regulation: 511-3-5-.07(4)(b) - (b) a flow meter measuring the rate of flow through the filter system with an appropriate range readable in gallons per minute (gpm) and accurate within ten percent actual flow shall be provided. the flow indicator shall be capable of measuring from
Observed flow meter not reading. PIC will have flow meter fixed/replaced to where it is properly working.
Regulation: 511-3-5-.22(12) - (12) a safety self-inspection shall be conducted daily by the trained operator or responsible person and documented on a log sheet.
Observed no log sheets to track the different levels and ranges. CA: A safety self-inspection shall be conducted daily by the trained operator or responsible person and documented on a log sheet.
Re-inspection
Regulation: 511-3-5-.06(3)(f)1. - 1. handrails, if removable, shall be installed in such a way that they cannot be removed without the use of tools.
Observed silver grab/hand rails loose on far left side of pool. CA: Handrails, if removable, shall be installed in such a way that they cannot be removed without the use of tools. PIC will have maintenance to tighten silver grab/hand rails as soon as possible.
Routine
Regulation: .17(1)(a)(b) - proper disinfectant level
Observed pool free chlorine level at 0.4 ppm. CA: All public pools free chlorine levels listed below: Minimum 1.0 Ideal 1.0-3.0 Maximum 10.0. PIC is in the process of adding chlorine to the pool now.
Regulation: 511-3-5-.06(3)(f)1. - 1. handrails, if removable, shall be installed in such a way that they cannot be removed without the use of tools.
Observed silver grab/hand rails loose on far left side of pool. CA: Handrails, if removable, shall be installed in such a way that they cannot be removed without the use of tools. PIC will have maintenance to tighten silver grab/hand rails as soon as possible.
Regulation: 511-3-5-.19(1)(b) - (b) dressing facilities, when provided, shall be have separations for each sex with no interconnection. the rooms shall be well-lighted, drained, ventilated, and of good construction with impervious materials. they shall be developed and planned so t
Observed shower curtains not in good condition in locker rooms. CA: Dressing facilities, when provided, shall be have separations for each sex with no interconnection. The rooms shall be well-lighted, drained, ventilated, and of good construction with impervious materials. They shall be developed and planned so that good sanitation can be maintained throughout the building at all times. PIC will have shower curtains replaced in locker rooms as soon as possible.
Re-inspection
Regulation: 511-3-5-.07(4)(b) - (b) a flow meter measuring the rate of flow through the filter system with an appropriate range readable in gallons per minute (gpm) and accurate within ten percent actual flow shall be provided. the flow indicator shall be capable of measuring from
Observed flow meter not reading. PIC will have flow meter fixed/replaced to where it is properly working.
Routine
Regulation: 511-3-5-.07(4)(b) - (b) a flow meter measuring the rate of flow through the filter system with an appropriate range readable in gallons per minute (gpm) and accurate within ten percent actual flow shall be provided. the flow indicator shall be capable of measuring from
Observed flow meter not reading. PIC will have flow meter fixed to where it is properly working.
Regulation: 511-3-5-.23(3)(d) - (d) the operator shall receive a copy of the inspection and place it in a location protected from the weather and in public view as designated by the health authority.
Observed most recent inspection report not posted for customers to see. PIC will have most recent inspection posted ASAP.
Re-inspection
Regulation: 511-3-5-.07(4)(b) - (b) a flow meter measuring the rate of flow through the filter system with an appropriate range readable in gallons per minute (gpm) and accurate within ten percent actual flow shall be provided. the flow indicator shall be capable of measuring from
Observed flow meter not reading. PIC will order a new flow meter and have it installed.
Routine
Regulation: 511-3-5-.23(5)(b) - (b) during operation, the ph is less than the minimum or more than the maximum levels allowed in dph rule 511-3-5-.l7.
Observed pH level at 8.0. pH range needs to be 7.2-7.8. CPO will bring pH into range of 7.2-7.8.
Regulation: 511-3-5-.17(1) - (1) disinfectant levels (a) free chlorine, ppm in pools not using cyanuric acid or a stabilized chlorine compound use (b),1.-5.
Observed combined chlorine at 1 ppm. Combined chlorine needs to be at 0.4ppm or less. CPO will bring combined chlorine back into range of 0.4ppm or less.
Regulation: 511-3-5-.07(4)(b) - (b) a flow meter measuring the rate of flow through the filter system with an appropriate range readable in gallons per minute (gpm) and accurate within ten percent actual flow shall be provided. the flow indicator shall be capable of measuring from
Observed flow meter not reading. PIC will order a new flow meter and have it installed.
Regulation: .06(3)(e) - markings
Observed no diving markers in the pool area. PIC stated that they will be ordering no diving marker ASAP.