Jul 25, 2025
Re-inspection
2560 DELK RD SE MARIETTA, GA 30067
Inspection scores over time for this facility.
Georgia inspection history is score-based, with violations grouped under each recorded inspection.
Re-inspection
Routine
water clarity is not clear
chlorine observed at 0ppm, maintain between 2-10ppm
skimmers not pulling/missing weirs
Re-inspection
Regulation: 511-3-5-.11(4)(f) - (f) makeup water shall be supplied through an air gap or other approved backflow prevention device.
Maintain water levels
Re-inspection
Regulation: 511-3-5-.23(5)(a) - (a) during operation, disinfectant levels are less than the minimum level specified in dph rule 511-3-5-.17. if the level of the disinfectant used is not specified in dph rule 511-3-5-.17, the disinfectant must be approved and kept at levels determin
Chlorine observed at +20 ppm. Must maintain between 2-10 ppm
Permit/Opening
Regulation: 511-3-5-.23(5)(a) - (a) during operation, disinfectant levels are less than the minimum level specified in dph rule 511-3-5-.17. if the level of the disinfectant used is not specified in dph rule 511-3-5-.17, the disinfectant must be approved and kept at levels determin
Chlorine observed at 0 ppm, maintain between 2- 8 ppm.
Regulation: 511-3-5-.23(5)(b) - (b) during operation, the ph is less than the minimum or more than the maximum levels allowed in dph rule 511-3-5-.l7.
pH observed less than 7.0: maintain between 7.2 and 7.8
Regulation: 511-3-5-.23(5)(h) - (h) absence of required lifesaving equipment on the deck or an emergency phone;
Obtain new life ring
Regulation: 511-3-5-.18(12)(c) - (c) the same sign in subsection (b) above or an additional sign will state under the heading “pool risks” the following items in clearly legible letters at least one inch high:
Obtain "pool risks" sign
Permit/Opening
Regulation: 511-3-5-.18(11)(b) - (b) openings in the barrier shall not allow passage of a four inch diameter sphere.
Large opening under pool double gate. Send photo of correction. UPDATE: 05/23/24 6:00pm - By text, EHS received photo of opening closure under double gate.
Permit/Opening
Regulation: 511-3-5-.06(3)(f)1. - 1. handrails, if removable, shall be installed in such a way that they cannot be removed without the use of tools.
Two sets of handrails loose, PIC securing rails while EHS on site.