Jun 8, 2026
Routine
3 - hot/cold running water under pressure in all required locations of tourist accommodation
Regulation: 511-6-2-.07(2) - hot water supply
Observed hot water to exceed 120F in all rooms inspected.
RCA: Told PIC that they need to turn the water temperature down
17 - proper ventilation; no sign of mold, mildew, odors or moisture
Regulation: 511-6-2-.08(5) - toilet and bathing ventilation
Observed vents in all bathrooms to have a heavy built-up of lent making it difficult to ventilate the bathroom.
RCA: Told PIC to ensure that all vents are clean. In existing tourist accommodations permitted prior to the adoption of this rule, the current ventilation must prevent odor, mold, mildew, and moisture