Jun 10, 2026
Permit/Opening
82 B LONGWOOD DR RICHMOND HILL, GA 31324
Inspection scores over time for this facility.
Georgia inspection history is score-based, with violations grouped under each recorded inspection.
Permit/Opening
Routine
Regulation: 511-3-5-.18(11)(h) - (h) access gates shall also comply with the requirements of this rule and shall be equipped to accommodate a locking device. barrier gates shall open away from the pool in facilities constructed after adoption of this chapter. pedestrian access gates
Observed that gate was not self closing or self latching. COS: gate was repaired so that it self closes and latches.
Regulation: 511-3-5-.07(4)(b) - (b) a flow meter measuring the rate of flow through the filter system with an appropriate range readable in gallons per minute (gpm) and accurate within ten percent actual flow shall be provided. the flow indicator shall be capable of measuring from
Flow meter appeared to not be functioning at time of inspection.
Regulation: 511-3-5-.17(4) - (4) stabilizer (if used) cyanuric acid,ppm ideal: 30-50 maximum: 90 comments: if stabilizer is: too high: - may reduce chlorine efficacy too low: - chlorine residual rapidly destroyed by sunlight note: stabilizer is not needed in indoor or br
Observed a CYA level of 96. CYA level needs to be reduced below 90 PPM.
Regulation: 511-3-5-.06(1)(l) - (l) open joints or gaps larger than three-sixteenths inch wide or with vertical elevations exceeding 1/4 inches shall be rectified using appropriate fillers. construction joints where pool coping meets the decks shall be watertight and shall not allo
Observed numerous areas where the deck area is cracked. Potential to injury to feet. CA: Please repair cracks in deck area to prevent injury.
Permit/Opening
Permit/Opening